Awake: 7:01am Temp 65 sleep 7+24 sunny overnight @ Nicktown.
After our coffee, we left Nicktown @ 8:20am & motored to Ebensburg, topped off our tank @ the Sunoco station & then continued to State College. Without rushing, we were (2) min early for our 10:00 am appointment with Matt. We spent (2.5) hrs with Matt, going over each & every window that we have on our house drawing. Kathy eliminated only (1). Here is the list of our potential windows: Next we visited the nearby Wal-Mart & shopped mostly for groceries. One thing on my list was a halogen light bulb for my desk lamp & Wal-Mart did not have the wattage it called for. So on up the road, we stopped @ a Home Depot & they had just what I needed.
Back on our property, I toured our BIG DIG project & realized that the outside wall had been "tarred but not feathered,' & the guys have been laying out the drain pipes for the entire house structure: laundry, kitchen, showers, bathtub, sinks, dishwashers, bathrooms, bar ice maker & sink, garage drains for autos, etc. That's a lot of pipage & they are just getting started. Dinner: Crab cakes, rice & asparagus.
Lights out: 11:51pm.
After our coffee, we left Nicktown @ 8:20am & motored to Ebensburg, topped off our tank @ the Sunoco station & then continued to State College. Without rushing, we were (2) min early for our 10:00 am appointment with Matt. We spent (2.5) hrs with Matt, going over each & every window that we have on our house drawing. Kathy eliminated only (1). Here is the list of our potential windows: Next we visited the nearby Wal-Mart & shopped mostly for groceries. One thing on my list was a halogen light bulb for my desk lamp & Wal-Mart did not have the wattage it called for. So on up the road, we stopped @ a Home Depot & they had just what I needed.
Back on our property, I toured our BIG DIG project & realized that the outside wall had been "tarred but not feathered,' & the guys have been laying out the drain pipes for the entire house structure: laundry, kitchen, showers, bathtub, sinks, dishwashers, bathrooms, bar ice maker & sink, garage drains for autos, etc. That's a lot of pipage & they are just getting started. Dinner: Crab cakes, rice & asparagus.
Lights out: 11:51pm.
Leave a comment