Awake: 5:48am Temp 62 sleep 6+30 cloudy -- later drizzle overnight @ Nicktown.
1st thing this morning, we gave Bernie the go-ahead to order the electrical switches & dimming switches.
Then during our KK meeting, Kathy left early & drove the Suzuki to the church hall to continue making noodles with the ladies & a few guys. Rain was in the forecast but my walk back to the M.H. was dry.
After my breakfast, I decided to do something about a small leak in the water system. We've been very satisfied with the Culligan water units thus far...except we do have a slight leak in the well itself.
I made a call to Natcher Drilling & Larry answered; I told him what I suspected & he said he would be right down. (22) min later, Larry pulled onto our driveway. He concurred on the well leak, pulled up the pipe, blocked it from falling, & started looking for a "O" ring in his workshop truck. "It's a pitiless adapter leak" he told me. "A new "O" ring will take care of that." And after several tests, I was convinced. I will advertize Larry's good work.
Kathy returned from noodle making @ 12:40pm. Minutes before she arrived, the FDX truck brought my sink for my basement bathroom.
I was impressed with the strong & well made box. I even liked what was inside the well made & strong box. A few minutes later; the UPS truck brought my faucet.
Larry called us (1) hour away from N.Y.C., @ 5:44pm; he wanted to know if the weather was ok in our area. I told him about the on & off light rain & nothing else...yet. He thinks they can make it to Nicktown tonight but if he can't, he will call to let us know.
Dinner: New England clam chowder, oyster crackers, mixed salad & toast.
Later, @ 11:13pm, Larry called to let us know that they will be spending the night at a hotel in Altoona, PA. I had already given Larry directions so we should hear from them tomorrow morning.
Lights out: 11:49pm.
1st thing this morning, we gave Bernie the go-ahead to order the electrical switches & dimming switches.
Then during our KK meeting, Kathy left early & drove the Suzuki to the church hall to continue making noodles with the ladies & a few guys. Rain was in the forecast but my walk back to the M.H. was dry.
After my breakfast, I decided to do something about a small leak in the water system. We've been very satisfied with the Culligan water units thus far...except we do have a slight leak in the well itself.
I made a call to Natcher Drilling & Larry answered; I told him what I suspected & he said he would be right down. (22) min later, Larry pulled onto our driveway. He concurred on the well leak, pulled up the pipe, blocked it from falling, & started looking for a "O" ring in his workshop truck. "It's a pitiless adapter leak" he told me. "A new "O" ring will take care of that." And after several tests, I was convinced. I will advertize Larry's good work.
Kathy returned from noodle making @ 12:40pm. Minutes before she arrived, the FDX truck brought my sink for my basement bathroom.
I was impressed with the strong & well made box. I even liked what was inside the well made & strong box. A few minutes later; the UPS truck brought my faucet.
Larry called us (1) hour away from N.Y.C., @ 5:44pm; he wanted to know if the weather was ok in our area. I told him about the on & off light rain & nothing else...yet. He thinks they can make it to Nicktown tonight but if he can't, he will call to let us know.
Dinner: New England clam chowder, oyster crackers, mixed salad & toast.
Later, @ 11:13pm, Larry called to let us know that they will be spending the night at a hotel in Altoona, PA. I had already given Larry directions so we should hear from them tomorrow morning.
Lights out: 11:49pm.
Leave a comment