Monday 17 September 2007

| No Comments | No TrackBacks

Awake: 5:02am Temp 69 sleep 5+50 overnight in the Newell campground.

Kyle rings our doorbell @ 6:50am & we are ready with slides retracted, water tank full, waste tank nearly empty, engine pre-heated, etc. He takes us to Bay # 11, right close to the service bldg cabinet shop.

Today, Mooney, the cabinet maker, will remove the (2) Sub-Zero freezer boxes & make ready for the full size up-right Sub-Zero refrigerator with (2) Sub-Zero freezer boxes. Dave brings us a portable freezer so we can transfer our frozen goods to the outside portable freezer on the floor in the service building.

It was a slow day for us; we were somewhat restricted from visiting our coach since those techs were very busy doing what they are trained to do. During their breaks, K & I would have our breakfast & later, our lunch. Most of the time we hung out in the customers lounge & chatted with other Newell owners, read the newspaper, some magazines & worked crossword puzzles. I would frequent other coaches to see what system the techs were working on & later, try & find out how they solved the problem.

7:35 dinner downtown @ the restaurant: Bussey’s Bar-B-Que where K & I share some cat fish, baked beans & a salad.
Lights out: 11:41pm

No TrackBacks

TrackBack URL: http://blogs.kirsch.org/mt/mt-tb.cgi/2240

Leave a comment

Categories

Monthly Archives

About this Entry

This page contains a single entry by George Monte Kirsch published on September 22, 2007 8:31 PM.

Sunday 16 September 2007 was the previous entry in this blog.

Tuesday 18 September 2007 is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.