Awake: 6:43am Temp 21 sleep 6+53 off & on snow with sunshine overnight @ Nicktown.
After our KK meeting, K & I exercised @ the X-Treme workout facility for (1.5) hrs. En-route to our motorhome, we made a stop @ Strollo's Home Center & purchased a (5) ft electrical cord. We also spent some time talking with John, the owner.
Back @ our house, the REA guys were working on the Geo-system & up on the main floor, Bernie's team was putting up wallboard. About 1:13pm, the well drillers arrived onto our circular driveway with (2) supply trucks & the well drilling rig; Here is the supply & water truck. They drove the main drilling rig around back & into the field to begin maneuvering & setting up for drilling the 1st well. Oops, the field was still a little soft & the drilling rig got stuck. A few phone calls later & Dave came to the rescue with the standby bull dozer; Minutes later, the drilling rig was pulled out .... and in position for the boom to be raised & the drilling process to begin. Around 4:30, the 1st well was finished & the crew left in the smaller supply truck for their respective homes about (30) some miles south. Meanwhile, I spent a good (1.5) hrs shoveling several paths in the snow & getting my water well set up for feeding the motorhome's pure water tank. Dinner: Filled peppers with a cottage cheese salad & toast.
Lights out: 11:44pm.
After our KK meeting, K & I exercised @ the X-Treme workout facility for (1.5) hrs. En-route to our motorhome, we made a stop @ Strollo's Home Center & purchased a (5) ft electrical cord. We also spent some time talking with John, the owner.
Back @ our house, the REA guys were working on the Geo-system & up on the main floor, Bernie's team was putting up wallboard. About 1:13pm, the well drillers arrived onto our circular driveway with (2) supply trucks & the well drilling rig; Here is the supply & water truck. They drove the main drilling rig around back & into the field to begin maneuvering & setting up for drilling the 1st well. Oops, the field was still a little soft & the drilling rig got stuck. A few phone calls later & Dave came to the rescue with the standby bull dozer; Minutes later, the drilling rig was pulled out .... and in position for the boom to be raised & the drilling process to begin. Around 4:30, the 1st well was finished & the crew left in the smaller supply truck for their respective homes about (30) some miles south. Meanwhile, I spent a good (1.5) hrs shoveling several paths in the snow & getting my water well set up for feeding the motorhome's pure water tank. Dinner: Filled peppers with a cottage cheese salad & toast.
Lights out: 11:44pm.
Leave a comment